PROBLEM TO BE SOLVED: To efficiently rebuild an elevated bridge for an expressway or the like without blockading the traffic. SOLUTION: After building a new bridge girder 1 directly below an old bridge girder 01, the new bridge girder 1 is moved upward, and the old bridge girder 01 is cut and separated from the bridge body while the new bridge girder 1 is supporting the load of the old bridge girder 01, the new bridge girder 1 is borne by bridge piers P1, P2 which previously supported the old bridge girder 01, then the old bridge girder 01 is wrecked and removed and thereafter an adjacent old bridge girder 02 is rebuilt sequentially to a new bridge girder 2 in the same manner. COPYRIGHT: (C)1999,JPO
(57)【要約】 【課題】 高速道路等の高架橋梁を、交通止めを行うこ となく、効率的に架け替えする。 【解決手段】 旧橋桁01の直下で新規橋桁1を構築し た後、新規橋桁1を上方へ移動させ、新規橋桁1が旧橋 桁01の荷重を支持した状態で旧橋桁01を橋体から切 り離し、前記新規橋桁1を旧橋桁01が支持されていた 橋脚P1,P2に支承させて、旧橋桁01の解体、撤去 を行い、以下、隣接する旧橋桁02も順次同様の方法で 新規橋桁2に架け替えすることを特徴とする高架橋梁の 架替工法である。

Claims

Description

Topics

Download Full PDF Version (Non-Commercial Use)

Patent Citations (0)

    Publication numberPublication dateAssigneeTitle

NO-Patent Citations (0)

    Title

Cited By (0)

    Publication numberPublication dateAssigneeTitle